Pegging-Relevant Elements Requirements, stock, or receipt elements that exist in SAP liveCache and that the system takes into account in dynamic pegging.
The system may only create dynamic pegging relationships between elements that are relevant for pegging.The system does not create dynamic pegging relationships to elements that are not relevant for pegging.The
Not Pegging-Relevant
indicator is automatically set in the order view for an element that is not relevant for pegging.
The system creates many alerts for
Production Planning and Detailed Scheduling
(PP/DS) on the basis of dynamic pegging relationships between requirements elements and receipt or stock elements.If an element is not relevant for pegging, the system cannot create a pegging relationship to this element.Since the system does not assign stock or receipt elements to non-pegging-relevant requirements elements, the system always displays a shortage for this requirements element, even if sufficient stock or receipts exist.The same applies to a non-pegging-relevant stock element or receipt element that always generates a surplus.You should take this into consideration when interpreting the quantity alerts that the system generates for these “planning problems”.
In the
net requirements calculation
in
Production Planning and Detailed Scheduling
(PP/DS), the system takes account of the pegging-relevant requirements, stock, and receipts.PP/DS can also take account of safety stock requirements and safety stock receipts if they are not relevant for pegging.For more information, see
Pegging Relevance of Safety Stock
.
The following tables provide an overview of the pegging relevance of requirements, receipts, and stocks.
Requirements elements |
Not relevant for pegging |
Relevant for pegging |
Relevant for pegging (conditional) |
|---|---|---|---|
Sales order schedule lines |
|
|
The schedule lines of sales orders are only relevant for pegging when you do not plan in SAP R/3 using the requirements strategy 10 (make-to-stock production).In this strategy, the system does not have the sales orders consume the planned independent requirements.In pegging, the system only uses the planned independent requirements. This means that it does not take account of the requirements twice. |
Scheduling agreement release for the sales scheduling agreement in
|
|
x |
|
Planned independent requirements |
|
x |
|
Stock transfer requirements |
|
x |
|
Dependent requirement, reservation |
|
x |
|
Dependent requirements for Phantom assemblies with in-house production orders that have been created based on iPPE runtime objects. Bulk materials |
x |
|
|
Safety stock |
|
|
Receipt elements |
Not relevant for pegging |
Relevant for pegging |
Relevant for pegging (conditional) |
|---|---|---|---|
Receipts from in-house production SNP and PP/DS planned orders Manufacturing orders |
|
x |
|
Receipts from external procurement: Purchase orders Purchase requisitions Scheduling agreement schedule lines |
|
x |
|
|
x |
|
|
Safety stock |
|
|
Stock element |
Not relevant for pegging |
Relevant for pegging |
Relevant for pegging (conditional) |
|---|---|---|---|
Unrestricted-use stock, unrestricted-use customer consignment stock, unrestricted-use supplier consignment stock |
|
x |
|
Stock in transit |
x |
|
|
Stock in transfer between locations |
|
|
These stock types are only relevant for pegging if you have configured this in the location product master on the
|
Stock in transfer between sublocations |
|
|
|
Quality inspection stock, customer consignment stock in quality inspection, supplier consignment stock |
|
|
|
Blocked stock, blocked customer consignment stock, blocked supplier consignment stock |
|
|
|
Restricted-use stock, restricted-use supplier consignment stock |
|
|

The source for stocks is an OLTP system: You execute inventory management in the OLTP system, and transfer stocks from there to SAP APO.
The descriptions of the stock types generally agree with the descriptions of the corresponding stock types in SAP R/3.Therefore, the links refer to the definitions of the stock types in SAP R/3, with the following exception: The descriptions of the stock in transfer differ in accordance with the mapping
Plant
→
Location
and
Storage Location
→
Sublocation
.
For the net requirements calculation in material requirements planning in SAP R/3 (PP-MRP), unrestricted-use stock, quality inspection stock, and stock in transfer between storage locations are always considered available.Stock in transit is not available.For stock in transfer between plants, blocked stock, and restricted-use stock, you define in Customizing for
material requirements planning
if these stock types are available for the net requirements calculation.These availability arrangements cannot be transferred from SAP R/3 to SAP APO in the standard system.
In SAP APO, you can change the availability of the stock types using the customer exit APOCF011.This is above all relevant for the stock types for which you cannot configure the availability in SAP APO.