Example of the Evaluation Sequence of Substitutions This section contains graphical examples of the evaluation sequence of substitute products and locations. You can specify the following sequences within rule control in integrated rules maintenance:
Products in locations
Locations for products
Products/input location, then locations/input product
Locations/input product, then products/input location
Products at locations without source location
Locations for products without source product




