validity window (PP-BD)

Basic Data (PP-BD)

A period that determines which objects in the worklist in the Engineering Workbench are hidden.

Objects that are invalid in the entire validity window, are hidden. Example

The validity window covers the start of February to the end of March. Item B10 is valid from the start to the end of January, and item B20 from the start of January to the end of February. Item B10 is hidden.