Entering content frameProcedure documentationChanging the Cost Estimate Without Quantity Structure Locate the document in its SAP Library structure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Product Cost Planning ® Material Costing ® Cost Estimate Without Quantity Structure ® Change.
  2. The screen Change Material Cost Estimate Without Quantity Structure appears.

  3. Enter the material and plant.
  4. In the Costing data tab page, enter the selection criteria for the cost estimate to be changed (Costing variant, Costing version, Valid on).
  5. Note

    Choose This graphic is explained in the accompanying textCost ests to search for the material cost estimate without quantity structure. The dialog box Selection of material cost estimates - w/o qty struct appears. Enter the selection criteria and choose This graphic is explained in the accompanying text. The system displays a list of the cost estimates found. You can transfer the desired cost estimate from the list by double-clicking on it.

  6. Choose This graphic is explained in the accompanying text.
  7. The list screen of the unit cost estimate appears.

  8. Edit the costing items.
  9. You can also use the detail screen for this. Place the cursor on the desired costing item, and choose This graphic is explained in the accompanying text.

  10. Choose This graphic is explained in the accompanying text and check the header information.
  11. Choose This graphic is explained in the accompanying text to save the costing items.
  12. When you save, the overhead is calculated. The costing items are saved temporarily. You return to the screen Change Material Cost Estimate Without Quantity Structure.

  13. Choose This graphic is explained in the accompanying text to save the material cost estimate without quantity structure.

See also: