Entering content frameOverview documentation Hints on Changing a BOM Group Locate the document in its SAP Library structure

You can choose BOM group ® Change to create or change one or more items in a BOM group. If you want to edit an item that is used with the same data in more than one variant in the BOM group (non-variable part), choose BOM group ® Change.

If you want to change a variant part that is only used in one variant of the BOM group, choose Material BOM ® Change.

Note

Once you change one BOM in a BOM group (one variant in a variant BOM or one alternative in a multiple BOM) with a change number, all BOMs in the BOM group have a history requirement. This means that you can only process BOMs in the group with a change number.

Leaving content frame