Entering content frameProcedure documentation Executing Mass Changes Locate the document in its SAP Library structure

When you have entered the reference object, as well as the BOM category, and if required, the selection criteria, the system displays a list of all the BOMs that meet the selection criteria entered.

  1. Select the BOMs or items that you want to apply the mass changes to.

In the list you are able to switch between a header overview and an item overview for the individual BOMs.

In the header overview, the following data is displayed for each BOM selected by the system:

If a bill of material is assigned to several plants, an asterix (*) is displayed in the place of the plant. If it is, there is only one BOM for all plants. Any change you make in one plant is valid in all of the other plants, too.

In the overview, the system always displays all multiple BOM alternatives for which a reference object exists. All multiple BOM alternatives are displayed in a highlighted block. Select the alternatives for which you want the change to be made.

If the reference object (for example, material) is used several times in a BOM (for example, as item 0010, 0044, 0070), an asterix (*) is displayed in the place of the item data. Double click on the entry to display the item overview for this BOM. In the item overview, you can decide whether to change each individual item.

The selected items of one BOM are displayed in the item overview.

Additional Activities in the Selection List

Pushbutton

Function

This graphic is explained in the accompanying text

Go from a header overview to an item overview

This graphic is explained in the accompanying text 

Go from an item overview to a header overview

Select BOMs

Select all alternatives of a multiple BOM

Deselect BOMs

Deselect all alternatives of a multiple BOM

Plant Assignments

Display all BOM plant assignments.

Caution

If the BOM is assigned to several plants, the change is made in all of them.

  1. Choose the processing function.

Result

The system automatically changes the BOMs and items selected. When the system has executed all changes, a log appears informing you about the system’s activities.

See also:

Reading the Log for Mass Changes

 

 

 