Entering content frameProcedure documentation Changing a Multiple BOM - Special Points Locate the document in its SAP Library structure

For information on options for changing multiple BOMs, see Options for Changing a Multiple BOM.

A multiple BOM groups together several alternatives. You can always only change one alternative at a time. For this reason, you must enter an alternative.

Note

If you want to change a variant part in one alternative, choose Material BOM ® Change.

If you want to change an item that is used with the same data in all alternatives (non-variable part, choose BOM group ® Change.

 

Leaving content frame