Entering content frameProcedure documentation Change Material BOM Initial Screen Locate the document in its SAP Library structure

  1. From the bills of material menu, choose Material BOM ® Change.
  2. You see the Change material BOM initial screen.

    If a default BOM usage is defined in your user master record, you see either this default value or the last BOM usage entered.

  3. Enter the data of the BOM you want to change.
  4. – In the Material field, enter the material whose BOM you want to change.

    – In the Plant field, enter the plant in which you want to change the BOM.

    – Enter the Usage if required.

    – For a simple material BOM or a variant BOM, do not enter an Alternative.

  5. Enter the effectivity data.
  6. – If the state of the BOM before the change is to be retained, enter a change number. The system determines the effectivity data from the change master record.

    If the valid-from date of the change number is in a protected time period and you see a warning message, confirm the warning and continue to make the change. If you see an error message, you cannot change the BOM with this change number.

    If the BOM has already been changed with one or more change numbers, and you want to select one of these, choose Extras ® More ® All chg nos for BOM.

    – If the processing status of the BOM header material has one or more revision levels assigned to it, and you want to process a specific revision level again, enter the revision level in the Revision level field. The possible entries function shows all the revision levels that have been assigned to the selected BOM header material.

    The system determines the valid-from date from the change master record.

    Note

    Once you process one BOM that is part of a BOM group (alternative of a multiple BOM or variant of a variant BOM) with a change number, you must use a change number to process all BOMs in the group.

  7. Confirm your entries.

Note

If the material BOM is allocated to several plants, you see a warning message. The changes you make to the BOM are relevant to all plants. For this reason, the system checks whether your user master record contains the field values required for authorization object C_STUE_WRK.

 