To change one variant BOM in a BOM group, choose Material BOM
® Change.Choose this function if you want to make a specific change to one variant, such as changing a variant part.
If you want to change an item that is used with the same data in all variants of the BOM group (non-variable part), choose BOM group
® Change.To change a variant BOM:
You see the Change material BOM initial screen.
– The Alternative field is not relevant to variant BOMs, so do not make an entry in this field. If the system displays a message about an entry in this field, confirm the message.
– Enter a Valid-from date or Change number.
If you change a variant BOM with reference to a change number, you may see an error message telling you to check the object management records.
See also
Changing a Variant BOM – Special PointsYou see the material item overview. From this screen, you can use all the general functions for changing BOMs.
You can edit a long text for your specific variant from any header detail screen. This text describes only one variant in the BOM group. You see this text in the AltText field. (For a multiple BOM, you see the text for an alternative in this field.)