Operation scrap is maintained for 2 material components in the BOM. One component is also subject to assembly scrap. The component quantities must be adjusted to include the scrap.
Quantity of material RB to be produced
Assembly scrap: |
1,000 pieces
10 % (pieces) |
Component 1: Operation scrap: Net indicator: ® Scrap quantity |
no entry not selected ®assembly scrap used in calculation 100 pieces |
Component 2: Operation scrap: Net indicator:
® Scrap quantity |
1 % selected, therefore assembly scrap not used in calculation 10 pieces |
Before component 2 is built into the assembly, the faulty assemblies are taken out of the process, and only the operation scrap is calculated.
The quantity for component
1 is for 1,100 racing bicycles to be produced. The quantity for component 2 is for 1,010 racing bicycles to be produced.