Maintenance of Selection Variables in Table TVARV
Purpose
For a report you need to specify variants with parameters. This is necessary because the report is informed of the process flow by means of these parameters. However, within a chain or at the start of various chains, the parameters can change. An example of this is the selection date. Due to the daily change, it is not possible to firmly define which date is required at the moment.
Define the parameters or the variants as selection variables that get their value from table TVARV. The value of a variable is read automatically from table TVARV, provided the attribute "selection variable" is set in the variant for the variable. Then choose the selection option and define which entry from TVARV is to apply as entry for the variable value. You yourself must maintain the table data.
Prerequisites
You can see whether a variable is a parameter or a selection option when you save the settings as variant. Behind every variable there is either a P (parameter) or an S (selection option). SAP recommends you first obtain an overview of the variables to be created. Then create the variables using transaction SM32 and use them in the variant. Date variables must be maintained in the format YYYYMMDD.
In the following table, the most important variables needed in the reports are listed.
Job name |
Field description in the report |
Variable category |
RFBKPDT2 |
Bank area |
Parameter |
RFBKPDT4 |
Bank area |
Parameter |
RFBKKC20 |
Bank area |
Selection option |
RFBKKC20 |
On |
Parameter |
RFBKCONC |
Bank area |
Selection option |
RFBKCONC |
Selection date balancing |
Parameter |
RFBKBSST |
Bank area |
Selection option |
RFBKBSST |
Statement date |
Parameter |
RFBKCLEB |
Bank area |
Parameter |
RFBKCLEB |
Posting date balancing |
Parameter |
RFBKCHACCUR |
Bank area |
Parameter |
RFBKSOCR |
Bank area |
Parameter |
RFBKACCL |
Bank area |
Parameter |
RFBKACCL |
Closure date |
Parameter |
RFBKCONA |
Bank area |
Parameter |
RFBKCONA |
Accrual/deferral key date |
Parameter |
RFBKGLBSPREP |
Bank area |
Selection option |
RFBKGLBSPREP |
To-date GL transfer |
Parameter |
RFBKGL02 |
Bank area |
Selection option |
RFBKGL02 |
To-date balance sheet preparation |
Parameter |
Process flow
In the most simple of cases (only one bank area exists) TVARV needs two variables:
You can include all other values directly in the variant. You must maintain the date variables daily.
There are two options for this:
You must define the report in such a way that in can be entered in a chain. For this, the report must make use of the same logic as the reports supplied by SAP. You can find the general logic in the Online Self Service in note 123217.
Then you must enter the report in the list of reports to be chained.