Entering content frameProcedure documentation Creating Inspection Plans Locate the document in its SAP Library structure

Use

If new specifications were created or data changed in specifications that are relevant for quality inspection, you can create one or more inspection plans for these specifications.

One inspection plan is created for each combination of specification, rating, plant, and material. You also have the possibility of grouping ratings together. In this case, an inspection plan is created for every combination of specification, plant, and material. If, during creation of the inspection plan, data is found to overlap in one value assignment type for one specification, a message to this effect appears in the Log. In these overlap cases, no data is transferred to the inspection plan from this particular value assignment type.

You have the option of assigning a change number to inspection plans. To do this, you must have created the corresponding change numbers in engineering change management in Logistics and approved the change number for use in inspection plans.

Prerequisites

You have edited the required Basic Settings and the Data Relevant for Inspection Plans.

Procedure

  1. In the initial screen for Structure link Editing Specifications, enter selection criteria to search for the required specifications.
  2. Choose This graphic is explained in the accompanying text.
  3. The hit list containing the selected specifications appears.

  4. Select one or more specifications and choose Extras ® QM inspection plan creation.
  5. The selection screen for inspection plan creation appears.

  6. As additional selection criteria, enter a Material, Rating, or Plant.
  7. Note

    The Customer and Vendor fields do not have a restrictive function. If you make entries here, the inspection plans are created with reference to the specified customer or vendor.

    Note

    If you set the Group all ratings indicator, all ratings for the selected specification are grouped together in one inspection plan. If you entered a number of ratings under This graphic is explained in the accompanying text, only these are grouped together.

    Make sure that when you group ratings together, data does not overlap.

  8. Choose This graphic is explained in the accompanying text.
  9. A list containing the selected specifications appears. An inspection plan is created for each line.

  10. Specify a key date from which the inspection plan is to be valid.
  11. Specify a change number if necessary.
  12. Note

    If you specify a change number, the key date is overwritten with the date of the change number.

  13. Select the lines in the list for which the system is to create inspection plans.
  14. If you want to create the inspection plans immediately, choose This graphic is explained in the accompanying text.

Note

You also have the option of creating the inspection plans at a later stage. In this case, proceed as follows:

  1. Choose This graphic is explained in the accompanying text Start time.
  2. A dialog box appears where you can specify execution times and dates.

  3. Enter the required data and choose This graphic is explained in the accompanying text.
  4. The list containing the selected specifications appears again.

  5. Choose This graphic is explained in the accompanying text.

Result

You have created one or more inspection plans. Display the inspection plan creation Log to see whether the process was successful.

Caution

When you create an inspection plan for the same specification again, the system does not create a new inspection plan but simply updates the existing plan.

Leaving content frame