Creating Inspection Plans
Use
If new specifications were created or data changed in specifications that are relevant for quality inspection, you can create one or more inspection plans for these specifications.
One inspection plan is created for each combination of specification, rating, plant, and material. You also have the possibility of grouping ratings together. In this case, an inspection plan is created for every combination of specification, plant, and material. If, during creation of the inspection plan, data is found to overlap in one value assignment type for one specification, a message to this effect appears in the
Log. In these overlap cases, no data is transferred to the inspection plan from this particular value assignment type.You have the option of assigning a change number to inspection plans. To do this, you must have created the corresponding change numbers in engineering change management in Logistics and approved the change number for use in inspection plans.
Prerequisites
You have edited the required
Basic Settings and the Data Relevant for Inspection Plans.Procedure
Editing Specifications, enter selection criteria to search for the required specifications.
The hit list containing the selected specifications appears.
The selection screen for inspection plan creation appears.

The Customer and Vendor fields do not have a restrictive function. If you make entries here, the inspection plans are created with reference to the specified customer or vendor.

If you set the Group all ratings indicator, all ratings for the selected specification are grouped together in one inspection plan. If you entered a number of ratings under
, only these are grouped together.
Make sure that when you group ratings together, data does not overlap.
A list containing the selected specifications appears. An inspection plan is created for each line.

If you specify a change number, the key date is overwritten with the date of the change number.

You also have the option of creating the inspection plans at a later stage. In this case, proceed as follows:
A dialog box appears where you can specify execution times and dates.
The list containing the selected specifications appears again.
Result
You have created one or more inspection plans. Display the inspection plan creation
Log to see whether the process was successful.
When you create an inspection plan for the same specification again, the system does not create a new inspection plan but simply updates the existing plan.