Stability Study
Stability Study
Conducting a Stability Study (Overview)
Status Management in the Stability Study
Physical Samples in a Stability Study
Basic Data for Stability Studies
Storage Condition
Strategy
Creating a Strategy with Packages
Initiating a Stability Study
Creating or Processing a Stability Study
Creating the Initial Sample
Assigning a Stability Bill-of-Material to a Stability Study
Confirming the Initial Sample
Performing the Initial Test
Creating an Inspection Lot for the Initial Sample
Completing the Initial Test
Planning the Stability Tests
Testing Schedule
Specifying Storage Conditions in a Stability Study
Creating the Testing Schedule
Creating an Inspection Plan for Each Storage Condition
Processing the Testing Schedule
Completing the Testing Schedule
Printing the Storage List
Maintaining the Storage Data
Printing the Physical-Sample Labels
Defining the Start Date for the Stability Tests
Performing the Stability Tests
Scheduling and Deadline Monitoring
Displaying the Test Dates in the Testing Schedule
Display and Processing of Test Dates
Monitoring the Deadlines Automatically
Stability Study Evaluations
Displaying the Scheduling Overview as a List
Displaying the Scheduling Overview as a Graphic
Displaying the Stability History
Displaying Packages in Inspection Plans
Completion of a Stability Test
Completing the Stability Study
Completing a Stability Study
Deactivating (and Reactivating) a Stability Study
Cancelling a Stability Study
Printing the Storage Removal List
Removing the Stability Samples from Storage
Unplanned Activities in the Stability Study
Adding More Storage Conditions to a Stability Study
Specifying Additional Storage Condition(s)
Creating a Manual Inspection Lot for a Storage Condition
Changing a Storage Condition
Deactivating a Storage Condition
Activating a Storage Condition
Deleting a Storage Condition
Changing the Scope of an Inspection Plan for a Storage Condition