Entering content frameFunction documentationSummarizations By Cumulations Locate the document in its SAP Library structure

Use

Cumulations are available for a limited amount of fields for each time ticket type. These standard cumulations are required to calculate the day and period results.

Integration

In addition to standard cumulations, result types and parameters influence day and period results.

Prerequisites

Settings for the standard cumulations in individual incentive wages are made in the Set cumulation rules for employees Customizing step.

Settings for the standard cumulations in group incentive wages are made in the Set cumulation rules for groups Customizing step.

Features

The following time ticket fields are available for standard cumulations:

Individual incentive wages

Standard cumulations are used in individual incentive wages for premium time tickets, if they are provided by the recording wage type ML01 (piecework time).

Example

The following time tickets are recorded for an employee:

Date

Employee Actual Time

Employee Target Time

Wage Type

Result

1. First day of month

3 hrs

3.5 hrs

ML01

116.667%

1. First day of month

5 hrs

6 hrs

ML01

120.000%

2. Second day of onth

8 hrs

10 hrs

ML01

125.000%

Standard cumulations are calculated as follows:

Date

Result

Employee Actual Time

Employee Target Time

Entire period

121.875%

16 hrs

19.5 hrs

1. First day of month

118.750%

8 hrs

9.5 hrs

2. Second day of month

125.000%

8 hrs

10 hrs

Each day is cumulated first (first day of month), and then the entire period.

If you key a premium time ticket with the wage type ML02 (average paid), then the times are not included in the standard cumulations. These times are cumulated in the Average result type.

Group incentive wages

Standard cumulations are carried out in group incentive wages for all time ticket types. Target times from the quantity time tickets and actual times from the person time tickets are cumulated.

If foremen time tickets are used, both values are included in the cumulation.

The day and period cumulations are carried out in the same way as for individual incentive wages.

 

Leaving content frame