Entering content frameFunction documentation Work in Process Locate the document in its SAP Library structure

Use

Report with which you can analyze work in process (WIP) in the following areas of Product Cost Controlling using product drilldown:

The reporting time frame can be cumulative or limited.

Structure

Data Displayed

 

Header Information:

 

Notes (for Production Campaigns):

Note on Summarized Analysis with Product Drilldown

In summarized analysis with product drilldown, you cannot separate creation and usage and you cannot report reserves. With product drilldowns, the report also shows the actual debits, actual credits, and balance for the work in process.

 

Prerequisites

You have determined work in process (or performed results analysis for product drilldowns) for the object to be analyzed in period-end closing for the particular results analysis version.

 

See also:

For detailed information on determining work in process, refer to the following:

Structure link Work in Process in Product Cost by Order

Structure link Work in Process in Product Cost by Period

Structure link Results Analysis

Leaving content frame