Entering content frameProcedure documentation Copying Flexible Planning Locate the document in its SAP Library structure

Procedure

  1. Select Flexible planning.
  2. Define the reference and choose Continue.
  3. You can change the reference in Change reference values by changing the following parameters and choosing Continue.
  4. – Planned quantity

    – Postpone

    – Percentage

    Display references appears. You can check the reference quantity.

  5. Select a reference, and choose Choose.
  6. The reference is copied to the current material.

  7. Select the item, and select Schedule lines.

Result

On the schedule lines screen, you can check and change the quantities and dates.

See also:

Changing PIRs