Entering content frameThis graphic is explained in the accompanying text Material Staging for Production Locate the document in its SAP Library structure

This scenario describes the flow of a goods movement within a warehouse number if several storage locations of a plant are assigned to one warehouse number.

Scenario

Prerequisites

Process Flow

  1. You trigger material staging for production order 10004711.
  2. You have defined production storage area 0092 for the components of the production order. The storage location of the production supply area is also 0092.

  3. The WMS creates a transfer requirement on the basis of the production order.
  4. The transfer requirement has no reference to storage location 0092.

  5. Based on the transfer requirement, you create a transfer order (TO) for staging in production.

The system creates the transfer order for standard storage location 0091 because the transfer requirement contains no storage location assignment.

  1. You stage the material for production.
  2. You confirm the TO for material staging.
  3. A positive quant is created for the staged material in storage type 100, storage location 0091.

  4. The system cumulatively executes a posting change for all of the confirmed putaway TOs from the warehouse into the production storage location.

The system deletes the quant in storage type 100, storage location 0091 and creates a new quant in storage location 0092.

 

 

Leaving content frame