You decide to put away the inspection lot in WM-managed storage before you have made the usage decision in Quality Management (QM). Since you are dealing with a destructive inspection, you book the sample quantity out of the warehouse stock following the quality inspection.
Prerequisites
You use the application component Quality Management (QM).
You have set the indicator Dyn. Bin material doc for the selected requirement type in the Customizing for Warehouse Management under Activities ® Transfers ®
Define Requirements Types.Process Flow
The quant in the goods receipt interim storage area has stock category Q.
You decide that the sample quantity of 10 pieces should remain in the goods receipt interim storage area.
You can use this transfer requirement for putting away the inspection sample after the usage decision.
In doing so, the system transfers the inspection lot number to the quant information of the quants that have been put away. All of the quants for the inspection lot have the stock category Q (inspection stock).
An inspection sample of 10 pieces of the material is destoyed. You release the remaining quantity of the inspection lot (90 pieces) to the unrestricted-use stock.
If you activate automatic transfer order creation for the posting change movement type, the WMS creates the posting change TO automatically in the background, based on the usage decision.
However, the system can only create the posting change TO in the background if you have set the indicator Frgrnd/bckgrnd for sample dialog box to D in the Customizing for Warehouse Management under Interfaces
® Define Quality Management, which defines that the system processes the inspection sample diaolg box in the background.Result
You have put away the material received before the quality inspection. After the quality inspection, you have put away the inspection lot in WM-managed storage, apart from the destroyed sample quantity.