Entering content frameProcess documentation Processing Returns Locate the document in its SAP Library structure

Purpose

Using this process, you can put rejected goods from a return back into your warehouse.

Prerequisites

For more information, see Structure linkCreating Returns.

Process Flow

  1. You create a returns delivery for the return.
  2. Note

    If you use Structure linkHandling Unit Management (HUM) and you want to put away the goods in a HU-managed storage location, Structure linkpack the goods.

  3. You create a transfer order based on the (returns) delivery.
  4. When the transfer order is created, the system determines the destination bin for the material to be putaway on the basis of predifined putaway strategies.

  5. You put away the goods and confirm the transfer order.
  6. You post the goods receipt for the (returns) delivery.

 

 

Leaving content frame