Entering content frameProcedure documentationCarrying Out Completeness Checks  Locate the document in its SAP Library structure

Use

You carry out a completeness check to check whether the Structure linkhandling units (HUs) that were picked for the process order are staged at the production line.

Depending on whether the completeness check for the process order or operation/phase was created in the Structure linkmaster recipe, you can

 

You can carry out the completeness check for:

All HUs that were picked for the process order are checked.

For each material to be used, at least one unit of measure must be available. All picked HUs do not have to be checked. One partial quantity per material is enough for the start quantity.

 

Goods issue posting

Since the identification is carried out directly before the actual use of the material, the material consumption can also be posted as goods issue at this time. In this case, the system carries out the GI posting automatically at the end of the sequence check if no separate goods issue posting is maintained in the master recipe.

The goods issue posting of the components is carried out at HU level. The quantity of all materials with all batches that are filled in HUs is posted as a goods issue.

A partial good issue posting of an HU is not possible. Only the complete HU can be posted as goods issue. In the case of an error, the complete HU is refused.

An independent goods issue document is created for each HU.

 

Prerequisites

  1. The standard process instruction category MI_HUCMP is maintained in the master recipe.

The following parameters are variable:

Characteristic

Characteristic value

Options

PPPI_BUTTON_TEXT

Completeness check

Standard text that appears on the pushbutton of the PI sheet

PPPI_FUNCTION_DURING_DISPLAY

 

Function during display allowed/not allowed

PPPI_EXPORT_PARAMETER

PPPI HU POST GOODS ISSUE

I_CONS

 

Direct GI posting: yes/no

PPPI_EXPORT_PARAMETER

PPPI_HU_DISPLAY_REQUIRED_HU

I_SHOW

 

Display staged HUs: yes/no

PPPI_EXPORT_PARAMETER

PPPI_HU_IDENT_LEVEL

I_CHECK

 

Inspection level:
Order, operation, phase

PPPI_EXPORT_PARAMETER

PPPI_HU_KIND_OF_COMPLETENESS

I_COMPL

 

Inspection of:
Complete quantity or start quantity

PPPI_EXPORT_PARAMETER

PPPI_HU_GET_ALLOWED_VALUES

I_VALREQ

Activation of F4 help to display picked HUs

 

The following parameters are not variable and are copied:

Characteristic

Characteristic value

Options

PPPI_FUNCTION_NAME

COMI_MATERIAL_COMPLETE_CHECK

Name of the function module

PPPI_EXPORT_PARAMETER

PPPI_RESERVATION

I_RSNUM

Reservation number is copied

PPPI_EXPORT_PARAMETER

PPPI_OPERATION

I_VORNR

Operation number is copied

PPPI_EXPORT_PARAMETER

PPPI_PHASE

I_PHASE

Phase number is copied

PPPI_EXPORT_PARAMETER

PPPI_PROCESS_ORDER

I_AUFNR

Order number is copied

PPPI_INPUT_REQUEST

Identification OK

Status message for material identification carried out successfully: yes/no

PPPI_IMPORT_PARAMETER

PPPI_STRING_VARIABLE

E_FLAG

VHUMI_IDENT_TEXT_&0100&

 

PPPI_STRING_VARIABLE

PPPI_IMPORT_PARAMETER

VHUMI_IDENT_FLAG_&0120&

E_TEXT

 

 

  1. The materials required for production were picked.
  2. The HUs that are to be identified have not yet been posted as a goods issue.

The can be the case, for example, if a completeness check with an automatic goods issue posting took place before the sequence check.

 

Procedure

  1. Choose Completeness Check in the PI sheet.
  2. The Material Identification: Completeness screen appears

    If maintained accordingly in the process instructions, the HUs for the process order or operation/phase are displayed.

  3. Enter the identification number for the picked HUs.
  4. a. If your terminal has a barcode scanner connected to it, you can enter it in this way. The barcode scanner dialog does not take place in the R/3 System.

    b. The system uses a symbol to inform you whether the identification number you entered is correct.

  5. Ending the completeness check:

The completeness check is confirmed as successful in the PI sheet.

The completeness check is complete when all of the picked HUs for a process order or operation/phase have been identified.

  1. Automatic GI posting, if maintained in the master recipe:

The system automatically posts the consumption of the components for the process order or operation/phase as a goods issue.

Messages are sent to the process message destination PI51. Use the message monitor to check whether the messages were processed correctly.

  1. The data from the completeness check and the goods issue posting are transferred to the batch record. Use the message monitor to check whether the messages were processed correctly.

For more information on sending messages, see:

Separate Goods Issue Posting

 

 

 

 

 