Prerequisites
To execute a partial conversion for a planned order you must first branch to the screen for query subset/order correction. Here you have the following options:
Shop Floor Control
The initial screen Create production order appears.
You reach the screen Query subset/order correction.
Current Stock/Requirements List
You reach the screen Current stock/requirements list.
You reach the screen Query subset/order correction.
MRP List
The initial screen MRP list appears.
You reach the screen Query subset/order correction.
Material Requirements Planning
The initial screen Create production order appears.
Procedure
The rest of the procedure is the same in all cases above:
During conversion, the system uses the scheduling type that is specified for the order type and plant entered in Customizing for Shop Floor Control, by choosing Operations ®
The system generates a production order for each line. Since the orders created have not yet been saved you at first receive temporary order numbers (for example, %0000000001).
As soon as a partial quantity has been converted to a production order the corresponding line in the screen can no longer be deleted. If you want to delete this, you must leave the transaction and execute a new partial conversion.
The screen Create production order: Header appears.
Once you have made the changes, choose to branch back to the Query subset / order correction screen.
Result
The system saves the production orders created.
If the total quantities of the created production orders is less than the remaining planned order quantity and the indicator Delete planned order has not been set, the planned order quantity is reduced accordingly.
If the total quantity of the created production orders is greater than or equal to the remaining planned order quantity, the planned order is deleted.