Entering content frameProcedure documentation Delimiting Task Assignments Locate the document in its SAP Library structure

Prerequisites

Delimit a task assignment if you want to change the validity period of the relationship record between a task and an object, so that the end date occurs sooner than stated. (This is relationship A/B 007.)

This can be necessary if your company plans to re-work job or position descriptions, and the task assignments may become invalid after a certain date.

You can delimit relationship records between tasks and:

Procedure

  1. On the Change Task Profile screen, choose the relationship record you want to delimit.
  2. Choose Edit ® Delimit ® Relationship.
  3. The Delimit Relationship dialog box appears. It displays the two objects linked by the relationship record selected.

  4. Choose Delimit Date.
  5. The Delimit Relationship dialog box appears.

  6. Enter a new end date.
  7. Choose Continue.
  8. Choose Delimit.
Leaving content frame