Entering content frameObject documentation Work Schedule (Infotype 1011) Locate the document in its SAP Library structure

Definition

Infotype with which you can define work schedules for organizational units, positions, or work centers.

Use

You define planned working times for your organizational units, positions, or work centers in order to store the projected volume of work per object. If a position is to be occupied, you can, for example, compare the planned working time stored for the position with the planned working time stored for the employee Structure linkInfotype 0007. In this way, you can avoid unwanted inconsistencies.

In these cases, positions inherit planned working times as follows:

Note

If the inherited working time does not cover the entire object period of the position, the position continues to inherit working times until the whole object period is covered.

In these cases, work centers inherit planned working times as follows:

You can maintain this infotype in Simple Maintenance or in Detail Maintenance.

You can report on working times using the report RHXSBES0 or RHSBES00 (Staff Assignments). The report shows work schedules of organizational units, and possibly positions, and employees, depending on the options you select. (If integration is active with Personnel Administration, the report also shows absentee statistics, as well as other personnel data, as long as you have the authorization required.)

Structure

A complete record for infotype 1011 includes the following entries:

A complete record for infotype 1011 for an organizational unit also includes the following:

If there is more than one work schedule group (subtype) in the organizational unit, then there might be multiple infotype records for a single unit.

Integration

If you have activated integration between Organizational Management and Personnel Administration in Customizing, when a position is to be newly occupied, the planned working time entered for the position in infotype 1011 is compared to the planned working time for the employee stored in infotype 0007. The work schedule check must also be activated for the relationship A/B 008 (Holder). For more information, see the Personnel Management Implementation Guide (IMG) under Organizational Management ® Basic Settings ® Data Model Enhancement -> Relationship Maintenance -> Maintain Relationships.

If your company uses Personnel Cost Planning, the system can use the work schedule information, together with the information stored in the Cost Planning infotype 1015, to perform calculations. See Structure linkPersonnel Cost Planning

In the Organizational Management component, work schedules are for reference purposes. They are not used to calculate payroll, for example.

Note

You can create more complex work schedules using the Workforce Planning component.

 

 

Leaving content frame