Entering content frameFunction documentation Preparation for Base Object Costing Locate the document in its SAP Library structure

Use

When you create a base planning object, it is always linked to a costing variant. This costing variant contains all the information needed to cost the object. You define and check costing variants in Customizing for Product Cost Planning.

The following graphic gives you an overview of Customizing for Reference and Simulation Costing:

This graphic is explained in the accompanying text

You specify a valuation variant and a costing type in the costing variant for Reference and Simulation Costing.

You also specify in the costing variant whether a cost element is required for each costing item.

See also:

For more information about the relevant settings in Customizing, see the Implementation Guide (IMG) for Product Cost Controlling.

Leaving content frame