Entering content frameAssigning Material to a Routing Locate the document in its SAP Library structure

Prerequisites

The material to be produced has a material master record in the system.

The material master record has been assigned a material type that is intended for use in a routing or rate routing (see Customizing for routings).

Procedure

  1. On the Header Overview screen, choose Routing ® Material assignment.
  2. Enter the following data:
  3. – The group counter of the routing, to which you want to assign material.

    – The material

    – The plant for the material

  4. Choose Continue.

 

 

Leaving content frame