Use
You use this function to determine which material is to be produced with a routing or rate routing.
On the basis of this assignment, the routing can be used for sales and operations planning, material requirements planning, creating production orders and product costing for this material.
Prerequisites
The material to be produced has a material master record in the system.
The material master record has been assigned a material type that is intended for assignment to a routing or rate routing (see Customizing for routings).
Features
You can link routings and the material to be produced in the following ways (see graphic):