Entering content frameProcedure documentation Evaluating the Planning Situation (Individual Layout) Locate the document in its SAP Library structure

Procedures

Evaluating the Planning Situation (Individual Layout)

To call up the planning situation, choose Evaluations ® Planning situation mat. from the long-term planning node.

Comparing the planning scenario with the operative planning situation or the operative planning result

You can compare the planning situation of the planning scenario with the operative planning situation or with the operative planning result.

To compare the simulative planning situation with the operative planning situation, select the Planning situation field on the initial screen of the planning situation.

To compare the simulative planning situation with the operative planning result, select the Planning result field on the initial screen of the planning situation.

The system branches to the comparison of the planning scenario and the operative planning situation or the operative planning result.
The system displays the planning scenario data and the data for the operative planning situation (or the operative planning result). The data from the operative planning situation (or from the operative planning result) are highlighted.

When opening or closing the row details, the data is always accessed and closed for the planning scenario data as well as the operative planning situation data or the operative planning result data.

Comparing the planning situation of a scenario with another planning scenario

To compare the planning situation of a planning scenario with the planning situation of another planning scenario, select the field Planning scenario in the initial screen of the planning situation and enter the key of the planning scenario which is to be used for comparison. The functions available here are identical to the functions available for the comparison of the planning scenario with an operative evaluation.

Leaving content frame