Prerequisites
You cannot change the Controlling level if there are procurement alternatives or procurement processes for that Controlling level that are already being used. A locked padlock symbol indicates that a Controlling level cannot be changed. If you want to change the Controlling level, note the restrictions in the following cases:
Procedure