Prerequisites

You cannot change the Controlling level if there are procurement alternatives or procurement processes for that Controlling level that are already being used. A locked padlock symbol indicates that a Controlling level cannot be changed. If you want to change the Controlling level, note the restrictions in the following cases:

Procedure

  1. Choose Accounting ® Controlling ® Product Cost Controlling ® Actual Costing/Material Ledger ® Environment ® Edit Controlling Level for Material.
  2. Enter the plant and the material.
  3. The padlock symbol next to the relevant Controlling level is not locked.
  4. Position the cursor on the Controlling level that you want to change, and double-click on the symbol Change Controlling level.
  5. Choose a Controlling level from the selection window.

 