Entering content frameProcedure documentation Executing Unplanned Withdrawal of Components for an Order Locate the document in its SAP Library structure

Use

You can withdraw materials for an order that are not listed as components in the order. These "unplanned withdrawals" cause the actual costs of the production order to be updated.

Procedure

  1. Choose Logistics ® Materials management ® Inventory management ® Goods movement ® Goods issue.
  2. Choose Movement type ® Consumption ® To order ® From warehouse. The system automatically proposes movement type 261 (goods issue for order).
  3. Enter the storage location from which the goods withdrawal should take place. Choose This graphic is explained in the accompanying text.
  4. The system automatically branches to the screen Enter Goods Issue: New Items.

  5. Enter the number of the production order, as well as the material number, quantity, unit of measure and, if necessary, the batch number for each material that should be withdrawn. Save the goods issue.

 

Leaving content frame