Use
You can use this function to specify in the routing which production resources/tools (PRT) are required when an operation is carried out.
After you have assigned production resources/tools to operations you can also assign them as test equipment to the inspection characteristics of the operation.
Prerequisites
A master record must have been created for production resources/tools in the system. Depending on the PRT category, the following additional requirements must be met:
Features
You can assign several production resources/tools to one operation. You can assign one production resource/tool to several operations.
When assigning PRTs to operations, you can enter certain data that determine how production resources/tools are treated during order processing.