Entering content frameProcedure documentation Releasing/Locking Production Resources/Tools Locate the document in its SAP Library structure

Use

When you create or change a production resource/tool (PRT), you can specify the availability of the PRT by entering its status. In this way, you can, for example, temporarily lock defective PRTs, in order to prevent them from being used. The status is taken into account when you:

Features

How you can release a PRT and for which areas you can do this depends on the category to which it belongs.

Note

When you check the PRT availability in production orders:

See also:

LO - Managing Material Master Data

PM - Structuring Technical Systems

CA - Document Management Guide

 

 

 

 

 

Leaving content frame