Entering content frameFunction documentation Control Key for Operations Locate the document in its SAP Library structure

Use

You maintain the control key for operations in Customizing for Shop Floor Control, by choosing Master Data ® Routing Data ® Define Control Key.

Schedule

Using the Schedule indicator you can define that an operation is scheduled. If an operation is

External Processing

If an operation is externally processed (relevant setting in the External processing key), you can define how it is scheduled. If the Sched. external op. indicator is

Capacity Requirements

You use the Det. Cap. Reqmnts indicator to determine whether capacity requirements are determined for an operation.

 

 

Leaving content frame