Entering content frameFunction documentation Exchanging Alternative Sequences Locate the document in its SAP Library structure

Use

When you create or change a production order you can exchange the standard sequence with an alternative sequence.

Prerequisites

The following conditions must be fulfilled:

A standard sequence can be exchanged with alternative sequences as often as you wish so long as the standard sequence

If these conditions are fulfilled then the system ask you when copying the routing whether you want to exchange an alternative sequence with a segment of the standard sequence.

Activities

If you decide to exchange sequences the system lists all existing alternative sequences in a dialog box. If you want to compare the operations to be exchanged in the standard sequence with the operations of one of the alternative sequences you should double-click on the desired alternative sequence.

 

Leaving content frame