Entering content frameProcedure documentation Executing Individual Conversion of Planned Orders Locate the document in its SAP Library structure

Prerequisites

The planned order that is to be converted to a production order must be marked as convertible. The material must permit in-house processing.

Procedure

  1. Choose Logistics ® Production ® Shop floor control ® Order ® Create ® From planned order.

You branch to the initial screen for converting a planned order.

  1. Specify the planned order number as well as the order type of the production order that you want to create.
  2. If the order type specified uses external number assignment, specify in the field order the number of the production order to be generated. Choose This graphic is explained in the accompanying text.

The system copies all the data in the planned order such as the order quantity, order dates and components. The system also selects a valid routing.

  1. Check the data copied from the planned order and change it if necessary.
  2. Choose This graphic is explained in the accompanying text.

 

Leaving content frame