Entering content frameProcedure documentation Editing the Specification Header Data Locate the document in its SAP Library structure

Prerequisites

If you want to edit a specification using a change number, you must enter the change number on the initial specification management screen.

See also: Engineering Change Management for Specifications

Procedure

  1. Choose one of the following steps:

The tab page for editing the specification header data appears.

Note

You can copy data from an existing specification (see Copying Specification Data).

  1. Enter data as required and save your entries.

Note

When you create the header data for a specification, you can enter a key in the Specification field. If you do not enter a key, the system assigns a key to the specification after you have made the required entries and confirmed.

If you want to assign references or specify inheritance relationships, choose the References or Relationships tab.

Result

The validity period is set depending on the change number specified. If no change number was entered, the validity period is unlimited.

Leaving content frame