Use
Use this function whenever you want to allow the user to branch from a message to one or more relevant activities in the IMG.
Prerequisites
Procedure
To assign an IMG activity in SE91:
The system displays a confirmation message in the status bar.
Result
You have assigned one or more IMG activities to a single message number. When the corresponding message is triggered, the user can go directly to the IMG to carry out all of the activities assigned to it.
To do this click the status bar after triggering a message and select the appropriate icon from the Help window to go to the IMG activity (Customizing or Maintain entries). In the Customizing: Select project dialog box click the pushbutton Continue without project entries to go to the structure in the IMG.
The active settings for the F1 help display in Help ® Settings determine which icon is displayed in the help window for switching to the IMG activity.
You select (Customizing) in Performance Assistant setting or (Maintain entries) in Modal window setting.