Function documentation Setting Requirements and Delivery Relevance Locate the document in its SAP Library structure

Use

Requirements and delivery relevance in delivery schedules is influenced by the document type, and the schedule line category that the system determines using the requirements planning indicator specified in the scheduling agreement header.

Integration

To decide which type of delivery schedule is currently relevant for requirements and delivery, the system uses the JIT delivery schedule horizon and the material requirements planning indicator in the scheduling agreement header.

If there are planning delivery schedules in the scheduling agreement and you have entered a planning delivery schedule instruction, the system determines requirements and delivery relevance according to different criteria. If this is the case, see the requirements and delivery relevance section on planning delivery schedules.


The R/3 System contains the following settings for the requirements and delivery relevance indicator:

The system determines relevance for requirements as follows:

MRP indicator B or D

MRP indicator A or C

The system determines relevance for delivery as follows:

MRP indicator A or B

MRP indicator C or D

Note the following when setting requirements planning and delivery relevance:

If, for example, a JIT delivery schedule horizon ends on 04/02 and the schedule line in the forecast delivery schedule begins on 04/01, the system sets the JIT horizon back to 03/31. The forecast delivery schedule is then relevant for planning and delivery as of 04/01 for planning indicator "B", for example.

Activities

To set or view the material requirements planning indicator, choose Goto ® Header ® Sales in the scheduling agreement.