Use
You use this procedure to assign a material that has already been assigned to one operation to another operation.
Procedure
– The material component overview for the routing
To do so, choose Goto
® Comp. assig. -gen. in the operation overview– The material component overview for the operation
In the operation overview select the operation and choose Goto ® Comp. assig. -op.
The Reassign Components dialog box appears and you can see the number of the sequence and the operation to which the material component was assigned.
If you do not know the number, you can call up a list of all the sequences and operations with their descriptions by choosing Operation list.
You can select a sequence and an operation from this list.
The system reassigns the components to the new operation.
A screen appears with settings for processing components.