
Creating Cross-Plant Material Variants
Use
For material variants that are procured externally, you can define the assignment to a configurable material in the basic data of the material master, because no plant-specific data needs to be determined for these variants.
Procedure
Enter a material number, an industry sector, and a material type for materials kept in stock.
Select the views that you want to process.
Do not select Material is configurable for a material variant.
You see the value assignment screen with the characteristics of the configurable material.
Configure the variant.
Result
The variant can be entered in a purchase order. The configuration of the variant is copied from the material master.
Cross-plant material variants can be used in Purchasing. However, they are not supported in Sales.