Procedure documentation Changing a Dependency Net Locate the document in its SAP Library structure

Procedure

To change a constraint, first you must enter the dependency net to which the constraint is allocated. You can make changes that are valid immediately or changes that become valid on a specific date in the future. If you want to make your change in the future, you must enter a change number with the valid-from date you require (refer to Changing a Single Dependency).

  1. Choose Dependency ® Dependency net ® Change.
  2. If you want your change to become valid on a specific date in the future, enter a valid change number.
  3. Choose Goto ® Allocations.
  4. You can change the allocations to the dependency net.

  5. If you want to make changes to a specific constraint, select the constraint you require.

If you choose Environment ® Change overview, you can display the validity period of a constraint.