Procedure
To change a constraint, first you must enter the dependency net to which the constraint is allocated.
You can make changes that are valid immediately or changes that become valid on a specific date in the future. If you want to make your change in the future, you must enter a change number with the valid-from date you require (refer to Changing a Single Dependency).You can change the allocations to the dependency net.
If you choose Environment
® Change overview, you can display the validity period of a constraint.