Entering content frameBackground documentation Key Figures Used Locate the document in its SAP Library structure

Key Figures Used in the Standard

Number

Number of work items for each selected characteristic.

Wait time

Cumulative wait time of the work items for the corresponding characteristic, in hours

The wait time is the difference between the start of processing (= first switch to status in process) and the creation time of the work item.

Process time

Cumulative process time of the work items for the corresponding characteristic, in hours

The process time is the difference between the end of processing (= switch to status completed) and the start of processing (= first switch to status in process) of the work item.

Total time

The cumulative total time is the sum of wait time and process time (in hours).

Average

The average total time in hours is the ratio of cumulative total time to the number of work items.

Dispersion

Dispersion (mean squared deviation) of the average total time.

Optional Key Figures

Average wait time: Tar_Mittel

The average wait time in hours is the ratio of cumulative wait time to the number of work items.

Average process time: Net_Mittel

The average process time in hours is the ratio of cumulative process time to the number of work items.

Dispersion: Wait time: Tar_Sigma

Dispersion: Process time: Net_Sigma

Wait time: Squared total: Tar^2_Sum

Squared total of the wait times.

Process time: Squared total: Net^2_Sum

Squared total of the process times.

 

 

 

 

 

Leaving content frame