
Capacity Leveling on the Capacity Planning Table
Accessing capacity leveling with the capacity planning table and filtering the selection data works the same way for the planning table as for the capacity planning table (tabular form) (see
Capacity leveling on the capacity planning table (tabular form)).After accessing the selection screen, if you press the function key
Continue you reach the planning table for SFC with the predefined overall profile. The work center view, for example, contains two charts:The changes (operations dispatched) are written to the database when you save the planning table.

You should note that when the system dispatches an operation it dispatches to all the various capacities at the relevant work center.
You can find information on dispatching operations in the capacity planning table in
Capacity planning table.You can find information on the time when the operations are dispatched in
Dispatching operations.