
Profile for Capacity Planning Table
The profile for the planning table contains settings that determine how the planning table is set up and what it looks like. This includes the following:

For an operation in the pool, the queue time, setup time, processing time, teardown time and wait time are displayed. However, for an operation that has been dispatched, only the setup time, processing time and teardown time are displayed.
For every graphical profile that was defined using these three entries the following are defined in Customizing for capacity leveling under Technical settings: