
Running the Time Evaluation Report (RPTIME00)
Use
The time evaluation report (RPTIME00) is usually run automatically every night, but can also be started manually from the menu. Ask your system administrator which method is used in your enterprise.
Procedure
Personnel number |
Enter the personnel numbers for which you want to run time evaluation. |
Evaluation schema |
The evaluation schema defines the steps to be performed during time evaluation. You will generally use a standard schema. |
Time statement variant |
The time statement variant determines how the results are to be displayed. The indicator then reads the corresponding form tables. A standard form is available. |
Display variant for log |
The time evaluation log knows from the display variant which user settings are used to display the log. |
Forced recalculation as of |
This field is usually left blank. If circumstances require, you can enter the date back to which time data must be reevaluated. Use this field:
If you do not make an entry in this field, the system sets the first day of the recalculation automatically. The system uses this set date, even if it is before the date you have specified. For detailed technical information on recalculation procedures, see Evaluation Period and Recalculation Recognition. |
Evaluation up to |
Time evaluation is run up to and including this date.
If you do not make an entry in this field, the system sets the current date. |
Program options |
You can use this parameter to store different technical information for the time evaluation log. These options do not affect the regular time evaluation procedure. |
Result
The time evaluation report is started.