Entering content frameFunction documentation Type 7: Sequence Definitions Locate the document in its SAP Library structure

In a sequence definition, you need to specify the number of the phase which has to be finished before the phase containing the sequence definition can be processed in the PI sheet.

Assign the following characteristic:

Characteristic

Meaning

Allowed values

PPPI_PREDECESSOR

Number of the phase which has to be processed first (predecessor phase)

Number of a phase contained in the current order


The characteristic PPPI_PREDECESSOR can be used only once in a sequence definition. If a phase has several predecessors, a separate sequence definition has to be created for each of them.

Notes on Using Sequence Definitions

 

 

 

 

Leaving content frame