Use

The Information System for investment programs allows you to create reports using either the current R/3 online database or a summarization database. Each of these types of database have their own standard reports. Each standard report is designed to be used either with the current database or a summarized database, but never with both.

Using a summarized database is recommended for reporting on large amounts of data (refer to Information System Using Summarization ).

Features

In the standard system, standard reports are in the controlling area currency, since the system always stores the complete budget, plan, and assigned values in this currency. However, you can enter a different reporting currency for the given report on its initial screen. The system then determines for each object (investment program position, appropriation request, internal order or WBS element) if the reporting currency is the same as the object currency:

Caution

It is not possible to display values in different currencies in different columns of one report.

(This is possible in the PS Information System, since it uses different key figures for the controlling area currency and object currency, unlike IM, which uses a reporting currency.)

 

 

 

 

 

 