Entering content frameProcedure documentation Changing the Project Team for a WBS Element Locate the document in its SAP Library structure

Use

Use this procedure to assign HR objects to a project team for a WBS element, or to delete assignments. You can assign people, positions and HR organization units to projects teams for WBS elements.

Prerequisites

You have called up the required project team for a WBS element.

Assigning HR objects

  1. You find the required objects in one of the following ways:
  1. Check the list of assignments and if necessary deselect assignments. .
  2. Save the assignments by choosing This graphic is explained in the accompanying text.

Deleting Assignments

  1. Position the cursor on the corresponding HR object and choose This graphic is explained in the accompanying text.
  2. The Delete assignment dialog box appears.

  3. Delete the assignment by choosing This graphic is explained in the accompanying text.

Result

Changes to the project team for a WBS element are saved as soon as you save a new assignment with This graphic is explained in the accompanying text or delete an existing one with This graphic is explained in the accompanying text.

If you only change the project team, it is not necessary to save the project or workforce planning.