If the lead time calculated in scheduling is longer than the time between the basic dates, the system will carry out reduction measures to reduce the lead time.

Reduction is carried out step by step. After each reduction measure, the system checks whether the calculated dates are within the basic dates. If this is the case, no further reduction measures are carried out.

This graphic is explained in the accompanying text

 

See also:

Reduction Strategy

Reduction in Operation

Reduction of Floats Before and After Production

 

 

 

 

 