Routings enable you to plan the production of materials (products). Therefore, routings are used as a template for production orders and run schedules as well as as a basis for product costing.
In order to |
You also require the components |
Plan the usage of materials |
Material master (LO-MD-MM) |
Plan the use of work centers |
Work centers (PP-BD-WKC) |
Plan the external processing of operations |
Purchasing (MM-PUR) |
Plan quality inspections that accompany production |
Quality planning (QM-PT) |
Prepare cost calculation according to routings |
Controlling (CO) |
Plan and to document changes to routings |
Engineering Change Management (LO-ECH) |
Classify routings |
Classification system (CA-CL) |
Automatically calculate the planned values for the activities to be produced |
CAPP Standard Value Calculation (PP-BD-CAP) |
In the R/3 System, routings have the same basic structure as the following objects:
· Master recipes
· Inspection plans
· Maintenance plans
· Standard networks
Therefore, routings are cumulated with these objects under the superordinate term Task list.
In a routing you plan
· The operations (work steps) to be carried out during production
· The activities to be performed in the operations as a basis for determining dates, capacity requirements, and costs
· The use of materials during production
· The use of work centers
· The quality checks to be carried out during production