Entering content frameProcedure documentation Deleting Base Planning Objects Locate the document in its SAP Library structure

Use

This function is designed so that you can delete test data before production startup of a system.

You can delete base planning objects in Customizing for General Controlling.

Procedure

  1. In Customizing for General Controlling, choose Production Start-Up Preparation ® Delete Test Data ® Delete Base Planning Objects
  2. Enter the base planning object(s) to be deleted.
  3. Enter the controlling area(s), if required.
  4. If you do not enter any base planning objects or controlling areas, all the base planning objects in all the controlling areas are deleted.

  5. By setting the corresponding indicator, you determine whether:

If you turn on this indicator, only those base planning objects are deleted for which the indicator Deletion flag has been turned on in the base planning object master data.

If you turn on this indicator, the base planning objects are not yet deleted.

  1. Choose This graphic is explained in the accompanying text.

Note

If you want to delete a large number of base planning objects, it is recommended that you have the system do this in the background. In such cases, choose Program ® Execute in background, and not This graphic is explained in the accompanying text. Check the background print parameters and choose Continue. Enter the start date and other start criteria for the background job. For example, you can specify that the job starts immediately, or not until another job has ended, or after a certain event has occurred. Choose This graphic is explained in the accompanying text to schedule the background job.

Result

The system deletes the master record as well as all the data that is linked to the base planning objects, such as the long text and costing items.

See also:

Implementation Guide for Controlling General